Exocetus DH 550 South Africa

Placeholder Picture

Just over three months into the build and both hulls are ready to turn.

Link to a time lapse of the first couple of weeks build.

Sea-Tribe Web Site

Placeholder Picture

Hull skins completed. 
Transoms fitted.
Hull support cradles constructed in preparation for the turn.

Placeholder Picture

Hull Side skins installed. 
Hull bottoms installed.
Keel construction in progess
Radius chine bonding in progress 

Placeholder Picture

Hull Side skins and bottom skin installation.

Placeholder Picture

Progress after three weeks.

Placeholder Picture

Starboard hull frame ready for side skin installation

Placeholder Picture

Starboard hull frame ready for side skin installation

Placeholder Picture

Filleting of stringers to bulkheads

Placeholder Picture

Radius Chine tangent joint. Radius chine is constructed from two 6mm layers of pre-formed ply profile.

Placeholder Picture

Sea-Tribe constructed a basic press for joining ply sections together.
Here the hull side skins are bonded together into large sections. 
Bonding the hull skin sections to the hull frame in large pieces produces
a finish which requires minimal fairing. 

Placeholder Picture

Sea-Tribe constructed a basic press for joining ply sections together.
Here the hull side skins are bonded together into large sections. 
Bonding the hull skin sections to the hull frame in large pieces produces
a finish which requires minimal fairing. 

Placeholder Picture

Stringer installation comences on starboard hull.

Placeholder Picture

Stringer installation comences on starboard hull.

Placeholder Picture

Stringer installation commences on starboard hull.

Placeholder Picture

Stringers are supplied in 20' lengths and joined on site into 60' lengths.

Placeholder Picture

Backbone and stem bonded in place, joining of stringers started.

Placeholder Picture

Progress after a couple of weeks work, eight hours a day, five days a week.

Placeholder Picture

Exocetus supplied a 40' container as part of the Sea-Tribe order. After shipping to South Africa the container is used as storage for all the kit components.

Placeholder Picture

Stem is bonded to bulkhead A.

Placeholder Picture

Back bone components are bonded together in one 55' assembly. A small capping strip stiffens the back bone and assists with dry fit and line up.

Placeholder Picture

Sea-Tribe are building both hulls at the same time.

Placeholder Picture

Bulkheads are placed in the build cradle. 

Placeholder Picture

Bulkheads are placed in the build cradle. 

Placeholder Picture

Applying biaxial to bulkhead.

Placeholder Picture

Sea-Tribe are building in a custom built marque in Durban. Exocetus went to South Africa in May 2017  to assist with the start of the project advising on build methods.
 
Build cradle contruction and bulkhead joining underway.

Placeholder Picture

Sea-Tribe based in Durban South Africa have purchased a complete Excetus DH 550 kit. Here the kit components with additional hardware including engines, generators, hatches, AC and DC distribution components etc are loaded into a container ready for shipment to SA.

Placeholder Picture

Patrick from Sea-Tribe travelled to the UK in August and Exocetus developed detailed design specifications for the Catamaran based on Sea-Tribes plans to use the DH 550 for charter. Exocetus were able to offer a competitive proposal for the supply of additional equipment to be included in the shipment to SA.